Navagantes, Brazil
February 2014 - April 2015
Client: Huisman Ltda.
Project:
- Foundation for Factory hall
- Design and construction of a hydraulic stearing table on existing Kobelco crane 2500G
Techniques used:
- Construction 1200 precast concrete piles
Features:
- For maximum capacity, precast concrete piles 46 metres in length were constructed for this project (50x50cm)
- For this project, the design, engineering and construction of shear table was carried out by Vanthek.
- The complete construction and mobilasation of the crane including diesel hammer and the shear table, as well as the project execution, was carried out by Vanthek Projects staff members.
- Also, local staff were trained in order to optimise the operations that were to be carried out.
Two Vanthek Projects staff members were utilised for parts of this project.